CTK builds maintenance regimes that take downtime off the shift plan. We run PPM around the operation, not against it - with asset data, condition monitoring and reports that pass audit the first time.
Across every building type.
The equipment we cover at fulfillment centres, distribution centres and sort centres - and how we work on it.
●FC // Fulfillment Centre
Long-running buildings where small wear issues snowball into peak failures. PPM is planned to the minute around stow, pick and ship windows.
Conveyor PPM
01
Belt tension, roller, photo-eye, gearbox oil and motor thermal checks on a rolling schedule.
Robotics field upkeep
02
Drive surface cleaning, fiducial integrity audits and charging contact inspections.
Pack / SLAM PPM
03
Printer head, applicator and scale calibration to spec - pre-peak readiness checks.
HVAC & chiller PPM
04
F-Gas compliant chiller, AHU and FCU service with refrigerant logging.
LV & thermographic surveys
05
Annual thermographic scans of switchgear, busbar joints and DBs with reports.
Statutory compliance
06
LOLER, PUWER, PAT, fire shutter drop-tests and emergency lighting logs.
●DC // Distribution / AMXL Centre
Heavy MHE and dock-side equipment with high impact risk. Maintenance is built around safety-critical inspections.
Racking inspections
01
Annual SEMA-qualified racking inspection with traffic-light reports and remedial works.
Dock equipment PPM
02
Leveller, shelter, restraint and shutter service to keep doors compliant and moving.
Forklift charger PPM
03
Charger, cable, connector and ventilation checks across charge rooms.
Sprinkler & fire systems
04
Wet/dry sprinkler service, ESFR head sampling, ASD detector calibration and weekly logs.